Upgrading from Integration with QC 9.20 to Integration with QC 10.00
To use your existing integration configurations with Quality Center 9.20 in PPM version 10.0-10.0.3, upgrade your integration configurations by doing the following,
-
Stop PPM Servers.
-
Uninstall Quality Center 9.20, install Quality Center 10.00, and upgrade Quality Center database.
For detailed instructions, see Quality Center Installation Guide.
-
If you have not upgraded to PPM version 10.0-10.0.3, follow the supported upgrade paths and upgrade your PPM instance from an earlier version to 10.0-10.0.3.
-
Back up the XML mapping file (
ITGQCIntegration.xml
). -
Upgrade the PPM-Quality Center Integration Tool by following the steps below:
-
Uninstall the existing PPM-Quality Center Integration Tool.
-
Download the new version of the PPM-ALM Integration Tool for QC 10.00 from the PPM Server file system (
<PPM_HOME>/integration/mac/ppmqcintegrationtool/setup.exe
).
-
-
Open the XML mapping file (
ITGQCIntegration.xml
) you backed up earlier using the new PPM-Quality Center Integration Tool, and deploy the file to both PPM Server and Quality Center 10.00 server. -
Make sure the
com.kintana.core.server.ENABLE_QUALITY_CENTER_INTEGRATION=true
setting is still present in theserver.conf
file. -
Restart PPM Servers.