Configuring a QC Project for the Integration
Here are the required steps to configure each QC project that is to be integrated with PPM:
- Enabling a QC Project for the Integration
- Creating the Mapping Between PPM and QC Fields
- Mapping the Notes Field in PPM to an Existing Project.
- Deploying the Mapping File to PPM and QC.
Note: If you want to integrate PPM requests with both existing and new defects in a QC project, create a new QC project with integration enabled and copy the existing defects (or the desired subset) from the existing project to the new project.